New systems · Licensed SCDES installer
A new septic system, quoted before most companies return your call.
Building on unsewered land? Replacing a failed system? In most cases we can quote your install from two things you already have: your SCDES permit and a photo of the site. Same day, usually.
How it works
The SCDES Permit to Construct tells us the system type, tank size, and field layout the state already approved. Your photo tells us slope, access, and trees. That’s 90% of the estimate — so you get a real number, not a range that doubles later.
We handle scheduling the SCDES final inspection. Most residential installs are done in 2–4 working days once we break ground.
What installs cost in the Upstate — honestly
Upstate clay and rock mean this isn’t Florida-sand pricing. Conventional systems here typically run in the high four figures to low five figures; sites that fail a standard perc test may need low-pressure pipe or engineered systems that cost more. Anyone quoting you a firm number without seeing your permit is guessing with your money.
Don’t have a permit yet? We can help — we dig test pits, walk sites before you buy, and handle the SCDES application process. See the Land Buyer’s Septic Check.